Appendix 3: Housing totals
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 3336
Received: 22/03/2021
Respondent: Mr Bernard Poulter
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then it shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses,to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Funcional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then it shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses,to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Funcional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 4716
Received: 23/03/2021
Respondent: Menston Parish Council
The numbers do not align with the Local Plan consultation
The numbers do not align with the Local Plan consultation
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 5261
Received: 24/03/2021
Respondent: Miss Teresa McDonell
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 5333
Received: 24/03/2021
Respondent: Mr Robin McDonell
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then it shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that's published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then it shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that's published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 5722
Received: 24/03/2021
Respondent: Mr Nick Jones
The figures are inaccurate for Burley-in-Wharfedale.You show 700 in the adopted Core Strategy, but then show 103 completions in the period 2013- 2020. This figure is misleading.You then identify a figure of 597 as the remaining requirement.
The Local Plan Review published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units bing built at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
The figures are inaccurate for Burley-in-Wharfedale.You show 700 in the adopted Core Strategy, but then show 103 completions in the period 2013- 2020. This figure is misleading.You then identify a figure of 597 as the remaining requirement.
The Local Plan Review published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units bing built at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 5848
Received: 24/03/2021
Respondent: SHMS
Not really an objection (do not support the previous higher housing numbers) However taking into account the reduced housing need (numbers) now identified, should this chart be updated and pro rata a higher rate per dwelling applied to ensure the same level of funding?. to be able to deliver the SPA improvements required
Not really an objection (do not support the previous higher housing numbers) However taking into account the reduced housing need (numbers) now identified, should this chart be updated and pro rata a higher rate per dwelling applied to ensure the same level of funding?. to be able to deliver the SPA improvements required
Object
Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document
Representation ID: 5937
Received: 24/03/2021
Respondent: Mr Roger Wilson
The Burley-in-Wharfedale figures are wrong. The Local Plan Review fails completely to record the 92 dwellings already well-under construction at Greenholme Mills. Additionally the small scale developments in Burley-in-Wharfedale (10-20) are also not included. The size of the Sun Lane and maybe Scalebor Park should be reduced accordingly. Otherwise BDMC is attempting to over develop a sensitive Greenfield site.
The Burley-in-Wharfedale figures are wrong. The Local Plan Review fails completely to record the 92 dwellings already well-under construction at Greenholme Mills. Additionally the small scale developments in Burley-in-Wharfedale (10-20) are also not included. The size of the Sun Lane and maybe Scalebor Park should be reduced accordingly. Otherwise BDMC is attempting to over develop a sensitive Greenfield site.