Object

Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document

Representation ID: 5261

Received: 24/03/2021

Respondent: Miss Teresa McDonell

Representation Summary:

Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.

Full text:

Under the heading of Burley-in-Wharfedale, you have inaccurate figures.
It shows 700 in the adopted Core Strategy, but then shows 103 completions in the period 2013- 2020.
This figure is misleading.
You then identify a figure of 597 as the remaining requirement.
The Local Plan Review that is published in parallel with this SPD, and to which constant reference has been made throughout, shows Burley-in-Wharfedale as needing 610 houses, to be delivered via the notorious Sun Lane development, (500 units) and a site at Scalebor (110 units) [Table A para5.16.33] It wholly fails to include the 92 units commenced at Greenholme Mills.
None of the recent windfall sites within the Village are included, despite there being roughly 15 units under construction in various locations.
This shows that BDMC are not putting the protection of the Functional land within 2.5km of the SPC/SAC above EXTRA development over target, purely for profit.