Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Search representations

Results for Environment Agency search

New search New search

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

HA2/H - Lees Lane, Crossroads

Representation ID: 28692

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY
Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

HA3/H - Lees Lane, Crossroads

Representation ID: 28693

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY
Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

HA4/H - Ebor Mills, Ebor Lane

Representation ID: 28694

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Flood Zones 2, 3 and the current/draft 3b/3a(i) within site boundary .

There is to be no development with the 3b/3a(i) extent unless considered water compatible or essential infrastructure. Where this is the case the development must demonstrate no increase in risk to others, no loss of Functional Floodplain and suitable mitigation measures for use and the lifetime of the development.

Development on site should follow a sequential layout so as to prevent unnecessary development within Flood Zones 3b, 3 and 2 wherever possible. If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate.

If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles. Some SuDs principles such as storage ponds should not be solely relied upon within areas at risk of fluvial flooding as they may not be operational during a flood.

Development must be shown to be safe for the lifetime of the development. See the Adept Guidance of Access and Egress plans. Hazard ratings may need to be assessed as part of the proposal.

Mitigation such a proofing measures and raised Finished Floor Levels, must be set above the 1 in 100 plus Climate Change level for the site. Current Guidance is on .gov.

The applicant must ensure there is no increase in risk to others for the lifetime of the development (including climate change). Where on Greenfield sites compensatory storage must be actively sought.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible. For development near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is likely these sites are going to show changes/increases in flood risk as a result of climate change.

The SFRA (to follow) is going to consider future flooding including future Functional Floodplain this may identify sites at more future risk than others which may affect its allocation or how development should be sequentially laid out on the site.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

HA5/H - Ashlar Close

Representation ID: 28696

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY
Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

HA6/H - Ivy Bank Lane

Representation ID: 28697

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY - Close to River and FZ2 and 3 alwell as current 3ai extent.

Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

OX1/H - Crossfield Road

Representation ID: 28699

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY
Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

OX2/H - Cross Lane

Representation ID: 28700

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Flood Zones 2, 3 and the current/draft 3b/3a(i) within site boundary .

There is to be no development with the 3b/3a(i) extent unless considered water compatible or essential infrastructure. Where this is the case the development must demonstrate no increase in risk to others, no loss of Functional Floodplain and suitable mitigation measures for use and the lifetime of the development.

Development on site should follow a sequential layout so as to prevent unnecessary development within Flood Zones 3b, 3 and 2 wherever possible. If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate.

If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles. Some SuDs principles such as storage ponds should not be solely relied upon within areas at risk of fluvial flooding as they may not be operational during a flood.

Development must be shown to be safe for the lifetime of the development. See the Adept Guidance of Access and Egress plans. Hazard ratings may need to be assessed as part of the proposal.

Mitigation such a proofing measures and raised Finished Floor Levels, must be set above the 1 in 100 plus Climate Change level for the site. Current Guidance is on .gov.

The applicant must ensure there is no increase in risk to others for the lifetime of the development (including climate change). Where on Greenfield sites compensatory storage must be actively sought.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible. For development near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is likely these sites are going to show changes/increases in flood risk as a result of climate change.

The SFRA (to follow) is going to consider future flooding including future Functional Floodplain this may identify sites at more future risk than others which may affect its allocation or how development should be sequentially laid out on the site.

Object

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

BI9/E - Castlefields Road

Representation ID: 28701

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site is identified to be either wholly, or most of, in the current/draft 3b OR 3a(i) - Site is fully in 3ai and is contains the 2019 draft in 3b extent, site is known to be at flood risk allocation should not be made here untill SFRA provides sufficent data and clear 3b designation.

This is a key aspect of conversation as part of the pending SFRA update as such no allocations should be made in these areas unless considered water compatible or essential infrastructure. Where this is the case the development must demonstrate no increase in risk to others, no loss of Functional Floodplain and suitable mitigation measures for use and the lifetime of the development.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

For development near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles. Some SuDs principles such as storage ponds should not be solely relied upon within areas at risk of fluvial flooding as they may not be operational during a flood.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

BI10/E - John Escritt Road

Representation ID: 28702

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Site in Flood Zone 1 ONLY
Mitigation should be set above the 1 in 100 plus cc level for the site as suitable for the proposed vulnerability classification (EA standing advice should cover this).

If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate. If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles.

For developments near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is possible the sites within close proximity to Flood Zones 3b, 3 and 2 may be subject to future risk identified within the SFRA (to follow) which may affect its allocation or how development should be sequentially laid out on the site.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

BI1/H - Coolgardie, Keighley Road, Crossflatts

Representation ID: 28703

Received: 24/03/2021

Respondent: Environment Agency

Representation Summary:

Flood Zones 2, 3 and the current/draft 3b/3a(i) within site boundary

There is to be no development with the 3b/3a(i) extent unless considered water compatible or essential infrastructure. Where this is the case the development must demonstrate no increase in risk to others, no loss of Functional Floodplain and suitable mitigation measures for use and the lifetime of the development.

Development on site should follow a sequential layout so as to prevent unnecessary development within Flood Zones 3b, 3 and 2 wherever possible. If the site is considered Greenfield then surface water discharge rates post development should be restricted to the pre development Greenfield discharge rate.

If the site is considered Brownfield then there should be a 30% reduction in surface water discharges, or restricted to Greenfield rates, there should be no increase in brownfield surface water discharge rates post development. So as to support prevention of cumulative increases to flood risk and should be in line with SuDs design principles. Some SuDs principles such as storage ponds should not be solely relied upon within areas at risk of fluvial flooding as they may not be operational during a flood.

Development must be shown to be safe for the lifetime of the development. See the Adept Guidance of Access and Egress plans. Hazard ratings may need to be assessed as part of the proposal.

Mitigation such a proofing measures and raised Finished Floor Levels, must be set above the 1 in 100 plus Climate Change level for the site. Current Guidance is on .gov.

The applicant must ensure there is no increase in risk to others for the lifetime of the development (including climate change). Where on Greenfield sites compensatory storage must be actively sought.

Consideration must be made to making space for water and providing betterment in terms of flood risk management where ever possible. For development near ordinary watercourses we would recommend an 8 metre easement strip along the length of the riverbank, or a 45degree angle from the bed in the case of culverts, to be kept clear of permanent structures such as buildings. This is to maintain access to the riverbank for any improvements or maintenance. A Flood Defence Consent may be required for the LLFA for works in/affecting an ordinary watercourse.

For main rivers, we generally require an 8 metre easement strip along the length of the riverbank to be kept clear of permanent structures such as buildings, or a 45degree angle from the bed in the case of culverts. This is to maintain access to the riverbank for any improvements or maintenance. Environmental Flood Risk Activity Permits may be required for development near rivers.

It is likely these sites are going to show changes/increases in flood risk as a result of climate change.

The SFRA (to follow) is going to consider future flooding including future Functional Floodplain this may identify sites at more future risk than others which may affect its allocation or how development should be sequentially laid out on the site.

For instructions on how to use the system and make comments, please see our help guide.