Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Search representations

Results for Natural England search

New search New search

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

IL1/H - Ben Rhydding Drive, Wheatley Grove

Representation ID: 19885

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

IL2/H - Skipton Road east

Representation ID: 19886

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

IL3/H - Coutances Way

Representation ID: 19887

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

IL4/H - Stockheld Road

Representation ID: 19888

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

KY14/H - Bradford Road, Riddlesden

Representation ID: 19889

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

KY15/H - Carr Bank, Riddlesden

Representation ID: 19890

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

KY2/H - Black Hill Lane

Representation ID: 19891

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

ME1/H - Bingley Road

Representation ID: 19892

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

ME2/H - Derry Hill

Representation ID: 19893

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

Comment

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

OX1/H - Crossfield Road

Representation ID: 19894

Received: 01/04/2021

Respondent: Natural England

Representation Summary:

The site lies in proximity to the South Pennine Moors (Phase 2) SPA and has potential to lead to the loss of functionally linked land for SPA birds.

We welcome the approach taken in the draft plan, SPD and assessments to loss of functionally linked land.

The council has a copy of a model to identify the suitability of sites for SPA golden plover and recommend that allocations are screened against this dataset taking the following approach:

• Maximum Training Sensitivity plus Specificity (MTSS) layer: full survey for Golden Plover likely to be required. The WY Ecology Service SPA Bird Survey Methodology should be followed.

• Minimum Training Presence (MTP) layer or 10 Percentile Training Presence (10PTP) layer: scoping survey to determine if a full Golden Plover full survey required. A desk based survey may be sufficient for sites within the MTP whereas a walkover survey may be required for sites within the 10PTP;

• Not within an area of predicted presence: No survey required for Golden Plover.

Where loss of functionally linked land cannot be ruled out at this stage we recommend that allocation requirement text in the plan sets out survey and mitigation requirements clearly.

For instructions on how to use the system and make comments, please see our help guide.