Object

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Representation ID: 23667

Received: 24/03/2021

Respondent: Bankhead (Eldwick) Ltd

Agent: Johnson Mowat

Representation Summary:

Housing Need and Requirement

Our clients have concerns with the Draft Plan’s strategic approach to the overall housing requirement and the Council’s chosen approach of dismissing the Government requirement of a 35% uplift to the housing requirement (Policy SP8).

It is considered at the very least, the 35% uplift as required by the Government should be applied to the overall housing requirement, resulting in an annual requirement of 2,300 dwellings per annum, rather than the Council’s preferred approach of 1,704 dwellings per annum.

Further the housing requirement for Bingley and the District should be seen as a minimum so as to demonstrate a commitment from CBMDC to significantly boosting housing delivery over recent years.

Once Site BI4/H and Site BI8/H is ‘Allocated’ our client will be looking to submit a planning application almost immediately. In this context the Delivery Timescales should be amended to 0 – 5 years.