Object

Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Representation ID: 3907

Received: 23/03/2021

Respondent: Mr Chas Ward

Representation Summary:

Area is unprepared for a development of this size: essential infrastructure is not capable of handling the excess load; existing residential areas face unacceptably undesirable impacts and risks. Pedestrian, road access, trains, schools, medical facilities would all need to be scaled up to handle additional load. Development of areas at flood risk is unacceptable. Risk of losing community identity. This scale of development is very unpopular and unacceptable to the local communities.