Object

Draft South Pennine Moors SPA/SAC Planning Framework Supplementary Planning Document

Representation ID: 5297

Received: 24/03/2021

Respondent: Mr Robin McDonell

Representation Summary:

There should also be a presumption against development within the 2.5 km zone unless it can clearly demonstrate through an independent HRA that there are no species affected.
If the Developer carries this out, they use their own retained ( and sometimes wholly owned) subsidiaries to carry out this work, primarily as a tick box, rather than as a true reflection of the species actually using a proposed site.
This results in Functional land being wrongly categorised as suitable with mitigation.

Full text:

There should also be a presumption against development within the 2.5 km zone unless it can clearly demonstrate through an independent HRA that there are no species affected.
If the Developer carries this out, they use their own retained ( and sometimes wholly owned) subsidiaries to carry out this work, primarily as a tick box, rather than as a true reflection of the species actually using a proposed site.
This results in Functional land being wrongly categorised as suitable with mitigation.