Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Representation ID: 5380

Received: 24/03/2021

Respondent: SHMS

Representation Summary:

Support providing the necessary common infrastructure needed for Silsden sites is provided in advance or parallel of development namely combined sewer up grading, electricity supply upgrading, highway improvements, improvement of footpath routes and bridge to access rail network.
Note outline application had £120, 000 contribution to bridge over A629.
Disappointing access arrangements do not fully address possibility of SI4/H coming forward or inclusion of a crossing point to access the Aldi store, interconnectivity with Belton Road and access to cycle routes and encourage walking to discourage use of private motor car.
Site is to incorporate a wetland habitat area which should be worked prior to or in parallel with development to ensure future residents can use on 1st occupation.