Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021

Representation ID: 5475

Received: 24/03/2021

Respondent: CPRE West Yorkshire

Representation Summary:

The sites proposed for Shipley, like many other sites Across the district, are proposed to be built within green belt land and at a density of around 26dpha, a figure much lower than the HO2 minimum of 35 dpha, and even more inconsistent with our position set out in policies SP4, SP5 and SP8. Moreover, site SH4/H is proposed for land which is expected to be within a Proposed Clean Air Zone. Whilst this site allocation mentions there are potential for some positive effects for the area, such as improvement to the local economy, there are some concerns.

Sites SH5/H and SH6/H are also proposed to be, at least in part, within the Proposed Clean Air Zone and both have elements of woodland along their boundary. There is the risk of flooding at these sites too as sections of the land is within flood Zone 2. As the last buffer of land between Cottingley and Shipley, it is important to maintain this open landscape.
Development on this land would result in the removal of a significant amount of woodland, which would be a major harmful impact.