Consultation Question 29
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23179
Received: 23/03/2021
Respondent: Johanna Murray
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23208
Received: 23/03/2021
Respondent: Luke Wellock
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23237
Received: 23/03/2021
Respondent: John Wright
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23266
Received: 23/03/2021
Respondent: Susan Saville
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23295
Received: 23/03/2021
Respondent: Ruth Tyson
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23324
Received: 23/03/2021
Respondent: Mrs Emily Corbett
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23353
Received: 23/03/2021
Respondent: Alan R Wood
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23382
Received: 23/03/2021
Respondent: Matthew Hill
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23411
Received: 23/03/2021
Respondent: Miss N Bateson
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23440
Received: 23/03/2021
Respondent: Martin Tyson
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 23615
Received: 22/03/2021
Respondent: Sandra Auty
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24127
Received: 23/03/2021
Respondent: Mr David and Elise Howe
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24171
Received: 23/03/2021
Respondent: Helen Stocker
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24210
Received: 24/03/2021
Respondent: Ellie Keighley
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24323
Received: 24/03/2021
Respondent: Mr Benjamin Statham
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24352
Received: 24/03/2021
Respondent: Katrina Kennedy
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24381
Received: 24/03/2021
Respondent: Stephen Corbett
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24410
Received: 24/03/2021
Respondent: James Stocker
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24441
Received: 24/03/2021
Respondent: Mrs Janine Ward
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24470
Received: 24/03/2021
Respondent: Catherine Hinchliffe
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24555
Received: 24/03/2021
Respondent: Lyndsey Lloyd
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24584
Received: 24/03/2021
Respondent: Steven Langford
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24605
Received: 24/03/2021
Respondent: Gleeson Homes
Agent: Pegasus Group (Leeds)
-Direction to comments on Policy SP8.
-The Council should consider other options to meet the 35% urban uplift. As highlighted previously, this could include a range of solutions such as new allocations and increased levels of delivery from the preferred allocations, providing any additional development can be accommodated in a sustainable manner.
-Wording of Policy HO1 does not emphasise the fact that the proposed housing requirement is the minimum housing need (Ref Para 60 NPPF).
-There is no requirement within the Framework to manage or phase the release of sites to deliver housing growth. It is noted the Council recognise this and justify the approach by stating “there is however still a need to ensure that sites are delivered in a sustainable manner and housing delivery is a key Government and Council goal”.
However, this is disputed as phasing the release of sites would unduly constrain sustainable developments. The Council’s most recent assessment of 5-year housing land supply identified only a 2.03-year supply; whilst this is based upon local plan requirement, it is clear that additional sites are required. It is therefore considered unjustified to artificially constrain allocations from coming forward.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24633
Received: 24/03/2021
Respondent: Michelle Schofield
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24708
Received: 24/03/2021
Respondent: Danny Schofield
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24746
Received: 24/03/2021
Respondent: Hamish Logan
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24775
Received: 24/03/2021
Respondent: Ashera Grande
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24853
Received: 24/03/2021
Respondent: Chris Knowles
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24940
Received: 22/03/2021
Respondent: Bridget Day
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.
Object
Draft Bradford District Local Plan - Preferred Options (Regulation 18) February 2021
Representation ID: 24969
Received: 22/03/2021
Respondent: Mr Rob Pawson
BDMC have clearly identified all sites, including strategic sites, which are specified and allocated in S5 of the Plan. These are shown in Table 4.14.1 which appears to be incorrect. There is a discrepancy between two sets of data. Why is this and how does this affect the delivery of the housing supply?
Also, no sites other than those delivering >400 houses are scheduled to start delivery before 2027 at the earliest. Many of these sites are close to District and employment centres already adequately served by local infrastructure. This would seem to contradict 4.14.10 and 4.14.11, given it has been acknowledged that in Wharfedale at peak times the services already run at capacity and that upgrading should be considered. Once again BDMC’s policy is to deliver 500 homes in Burley-in-Wharfedale on green belt, rather than taking a brownfield first policy approach.