Bradford District Local Plan - Publication Draft (Regulation 19) (October 2026)

Ends on 30th November 2026 (41 days remaining)

Section 7: Implementation and Monitoring Comment

Delivering in Partnership

7.1.1The Local Plan represents an opportunity for the Council to set a positive vision for the Bradford District. However, it is important to recognise that many other processes will influence their achievement, including the implementation of other plans and strategies produced at the national, sub-regional and local levels; investment by the public, private and voluntary sectors; and the actions of individual businesses and residents. The Local Plan is therefore an essential component in delivering the spatial vision and strategic objectives, but not sufficient on its own. This means that the Council has to develop a wide range of partnerships to ensure that this takes place. Key partners will include:

  • Developers;
  • Housebuilders;
  • Local communities e.g. through the development of Neighbourhood Plans;
  • The business sector and their representatives;
  • Infrastructure providers e.g. utilities companies, transport providers, the NHS and emergency services;
  • Government agencies e.g. the Environment Agency, Homes England, and Natural England.
  • Regional/Sub-Region bodies e.g. Transport for the North, Local Nature Partnership and adjoining local authorities;
  • West Yorkshire Combined Authority; and
  • Leeds City Region Local Enterprise Partnership

Monitoring and Review

7.1.2A key feature of the Local Plan is the implementation of a coherent, robust and flexible monitoring framework that enables Bradford Council to respond effectively to changing circumstances. This supports a plan-monitor-manage approach, allowing elements of the Local Plan to be reviewed and updated where necessary.

7.1.3The principal mechanism for monitoring the performance and effectiveness of the Local Plan will be the Authority Monitoring Report (AMR). The Localism Act 2011 requires local authorities to prepare AMRs to:

  • assess progress in implementing the Local Development Scheme (LDS).
  • evaluate the extent to which policies and proposals set out in local development documents are being successfully delivered.

7.1.4Implementation of the Local Plan will be monitored annually through a schedule of Local Plan Indicators (LPIs), as set out in Table 7.1. These indicators will provide a clear and reliable measure of progress against the Plan’s objectives and policies, considering the availability and quality of data sources accessible to Bradford Council. Through this Monitoring Framework, the AMR will identify any issues requiring attention by the Council and its partners to improve delivery and outcomes. Where necessary, the AMR may also recommend a partial or full review of the Local Plan.

7.1.5In addition to monitoring the objectives and policies, the AMR will assess a range of contextual information, such as population growth and demographic trends, to review baseline conditions across the district. This will help determine whether the Local Plan’s spatial strategy is being delivered as intended, remains appropriate, and continues to support sustainable development.

7.1.6The AMR will also monitor the indicators contained within the Sustainability Appraisal (SA) Monitoring Framework. The Sustainability Appraisal assesses the social, economic and environmental effects of the Local Plan and helps ensure that the principles of sustainable development remain central to the plan-making process.

7.1.7Furthermore, the AMR will monitor and review progress in delivering the Local Infrastructure Plan (LIP) and report on the Council’s activities in fulfilling its Duty to Cooperate with neighbouring authorities and other relevant bodies.

7.1.8As part of the plan-monitor-manage approach, the indicators and targets within the monitoring framework will be reviewed periodically throughout the plan period to ensure they remain relevant and effective. Additional indicators may also be incorporated into future AMRs where appropriate. It should be recognised that, for some indicators, the full effects of Local Plan policies may only become apparent over a longer period, and therefore trends may need to be assessed over several years before meaningful conclusions can be drawn.

Table 7.1: Local Plan Indicators (LPIs)

Local Plan Indicator (LPI)

Target / Trend

Link to Local Plan Strategic Objective (SO)

Link to Local Plan Policy

Source / Delivery Agencies

LPI\H1

Monitoring housing delivery against the Local Plan housing trajectory:

a) completions in previous years (since 2025)

b) completions in reporting year

c) extant planning permissions

d) managed delivery target

Meet minimum target of providing 33,669 net new homes 2025-2043

SO1, SO2

SS2, HO1

Bradford Council

LPI\H2

The percentage of new dwellings being developed on Previously Developed Land (PDL)

Meet minimum target of 25 percentage

SO1, SO2, SO3

HO1

Bradford Council

LPI\H3

Five-year supply of deliverable housing

100% as set out in the latest Five-Year Housing Land Statement

SO1, SO2

SS2, HO1

Bradford Council

LPI\H4

Number and percentage of dwellings completed against the following density (dwellings per hectare (dph)) requirements:

a) 35 dph (net) across the District

b) 50 dph (net) within 800m of a well-connected station

c) 75 dph (net) within 800m of a well-connected station and as a 70+ connectivity score

d) 150 dph (net) within the Regional City or a Principal Town and an 80+ connectivity score

c) 300 dph (net) within the defined City Centre

Achieve the density expectations outlined in the Policy HO2

SO1, SO2, SO3

HO2

Bradford Council

LPI\H5

Net additional dwellings, by size, type and tenure:

a) in current year

b) with extant planning permission

Broadly to achieve proportions of need identified in the SHMA by end of the Plan period

SO1, SO2, SO3

SS2, HO3, HO5, HO6

Bradford Council

LPI\H6

The number and percentage of affordable homes:

a) for the District

b) by market sub-area

c) on rural exception sites

Meet minimum target of providing 13,842 net affordable homes 2025-2043

SO1, SO2, SO6

HO4

Bradford Council

LPI\H7

The number of planning approvals made by individuals, developers or groups/organisations which include Self-Build and Custom Build Housing types and/or Service Plots for Self-Build. 

Monitor take up/change

SO1, SO2, SO3

HO5

Bradford Council

LPI\H8

Net additional pitches for gypsies and

travellers

To meet the following minimum requirements:

  1. 19 net additional gypsy and traveller pitches between 2026/2027 and 2030/2031
  2. 29 net additional gypsy and traveller pitches between 2031/2032 and 2042/2043

SO1, SO2

HO7

Bradford Council

LPI\H9

Monitor the delivery of new homes against the national described space standards (NDSS) and Building Regulation requirements

All new homes to meet NDSS
5% new build homes to meet Building Regulations requirement M4(3)
95% new build homes to meet Building Regulations requirement M4(2)

SO1, SO2, SO5

HO8

Bradford Council

LPI\H10

Number of Empty Homes

Decrease over Plan Period

SO1, SO2, SO3

HO9

Bradford Council

LPI\E1

Amount of employment land (ha) and floorspace (sqm) developed; by type

To meet the employment requirement (110.5 hectares) over the plan period

SO2, SO7

EC1

Bradford Council

LPI\E2

Amount of employment land (ha) and floorspace (sqm) lost to alternative uses (non-B use class):

a) on allocated employment sites

b) in Employment Zones

No overall loss

SO2, SO7

SS2, EC1, EC2

Bradford Council

LPI\E3

Overall Employment Rate

Decrease over Plan Period

SO7, SO9

EC3

Office of National Statics (ONS)

LPI\E4

Number of wards with LSOAs in bottom 10% most deprived for employment deprivation

Decrease over Plan Period

SO7, SO9

EC3

Office of National Statics (ONS)

LPI\E5

Number and distribution of wards with LSOAs in the bottom 10% nationally for education, skills and training deprivation

Decrease over Plan Period

SO7, SO9

EC3

Office of National Statics (ONS)

LPI\E6

% of residents 16 or over who are economically active but are unemployed (by ward)

Decrease over Plan Period

SO7, SO9

EC3

NOMIS

LPI\TC1

The number of up to date Vitality and Viability Assessments of the hierarchy of centres.

No Target. Monitor trend

SO7, SO8

TC1

Bradford Council

LPI\TC2

Number of planning permissions for hot food takeaways within 400m of a school

No hot food takeaways permitted within 400m of a school unless justified in line with the policy

SO16

TC3

Bradford Council

LPI\TR1

The number and length of new dedicated walking and cycle routes delivered through the Local Cycling and Walking Infrastructure Plan (LCWIP)

Increase over the Plan Period

SO10, SO12, SO16

TR1, TR2, TR4

Bradford Council

West Yorkshire Combined Authority (WYCA)

LPI\TR2

The length of new routes delivered for the Wharfedale Greenway and Great Northern Rail Trail

Increase over the Plan Period

SO10, SO12, SO16, SO18

TR1, TR2, TR4

Bradford Council

LPI/DS1

Number of proposals granted contrary to Policies DS1 to DS4

None (0)

SO5

DS1, DS2, DS3, DS4

Bradford Council

LPI\SC1

Amount of new and loss of community facilities and/or infrastructure

No loss of community facilities and/or infrastructure

SO4, SO10, SO13, SO16, SO18

SC1, SC3, SC4, SC5, SC6

Bradford Council

LPI\SC2

Amount of developer contributions paid through the Community Infrastructure Levy (CIL) and other developer contributions.

No Target. Monitor contributions

SO4, SO10, SO13, SO16

SC1, SC2, SC3, SC4, SC5, SC6, NE2

Bradford Council

LPI\SC3

Number of new education facilities

No Target. Monitor take up/change

SO9

SC3

Bradford Council

LPI\SC4

Number of wards with LSOAs in the bottom 10% most deprived for health deprivation

Decrease over Plan Period

SO16

SC4

Office of National Statics (ONS)

LPI\SC5

Number, type and amount of financial contributions through CIL and/or S106 towards health care

No Target. Monitor contributions

SO16

SC4

Bradford Council

LPI\SC6

Change in in the amount of indoor sport and recreation provision, by type and settlement

No net loss over 5 consecutive years

SO16, SO18

SC5

Bradford Council (Integrated Sports Assessment)

LPI\SC7

Number of Health Impact Assessments (HIA)

No Target. Monitor trend

SO16

ST4, TC3

Bradford Council

LPI\SC8

Number, type and amount of financial contributions through CIL and/or S106 towards other facilities and/or infrastructure

No Target. Monitor contributions

SO16

SC1, SC3, SC5

Bradford Council

LPI\CR1

Measure air pollutants within Air Quality Management Areas (AQMA)

Decrease over Plan Period

SO12

CR1

Department for Environment, Food and Rural Affairs (DEFRA)

LPI\CR2

The number of installations of EV and Rapid Charging points

Increase the number of EV and Rapid Charging points

SO12

CR1

Department for Transport

Bradford Council

LPI\CR3

Ecological status of rivers

Increase in number of main river sections which have a ‘high’ or ‘good’ ecological status

SO15

CR2

Environment Agency (EA)

LPI\CR4

Number of developments including renewable energy low carbon sources

To achieve net zero carbon by 2038 (West Yorkshire Combined Authority (WYCA))

SO12

CR3

Department for Energy Security
& Net Zero

Bradford Council

LPI\CR5

Number of planning permissions granted contrary to
Environment Agency advice in areas at risk from flooding

None (0)

SO15

CR4

Environment Agency (EA)

LPI\CR6

Number of planning permissions granted contrary to Environment Agency advice on water quality grounds

None (0)

SO15

CR4

Environment Agency (EA)

LPI\CR7

Number, type and amount of financial contributions through CIL and/or S106 towards flood prevention

No Target. Monitor contributions

SO15

CR4

Bradford Council

LPI\CR8

Number of planning permissions incorporating SuDS

No Target. Monitor improvement

SO12, SO15

CR4, NE1

Bradford Council

LPI\NE1

Percentage of watercourses within the District that meet ‘Good’ ecological status

Improve overall water quality of watercourses in the District

SO13, SO14, SO15

NE1

Environment Agency (EA)

LPI\NE2

The number and percentage of major development proposals meeting the following Urban Greening Factor scores:

a) Residential minimum score 0.4

b) Commercial / Industrial minimum score 0.3

No Target. Monitor change / trend

SO12, SO13, SO14, SO15

NE1

Bradford Council

LPI\NE3

The number and percentage of major development proposals meeting the following Urban Tree Canopy Cover (UTCC) standards:

a) Residential minimum 25% tree canopy cover

b) Commercial / Industrial minimum 16.5% tree canopy cover

No Target. Monitor change / trend

SO12, SO13, SO14, SO15

NE1, NE6

Bradford Council

LPI\NE4

Change in areas (ha) of Open Space, by typology and settlement

No net loss over 5 consecutive years

SO12, SO13, SO14, SO15, SO16

NE2

Bradford Council

LPI\NE5

Amount of new residential development permitted within the South Pennine Moors SPA/SAC Zone C which contribute to the Strategic Mitigation Strategy:

a) completed annually

b) with extant planning permission

No Target. Monitor change / trend

SO12, SO13, SO14, SO15

NE2, NE3

Bradford Council

LPI\NE6

Amount of land designated for biodiversity and geological diversity and its condition

To maintain and increase the amount of land designated for ecological and geological importance

Improve condition of designation sites

SO12, SO13, SO14, SO15

NE3, NE4

Bradford Council

LPI\NE7

Percentage of new developments providing at least 10% Biodiversity Net Gain (BNG) along with the amount and type of BNG provided through development.

In accordance with Policy GS6 achieve greater than 10% BNG where applicable.

SO12, SO13, SO14, SO15

NE5

Bradford Council

LPI\NE8

The number and percentage of ancient woodland or of veteran trees lost

No loss

SO12, SO13, SO14, SO15

NE6

Bradford Council

LPI\HE1

Number and percentage of Listed Buildings in the Saltaire World Heritage Site deemed to be ‘at risk’.

A net reduction over the Plan Period

SO11

HE1

Historic England (HE)

Bradford Council

LPI\HE2

The condition of the key views to and from the Saltaire World Heritage Site to be maintained and improved.

Monitor change over the Plan Period

SO11

HE1

Bradford Council

LPI\HE3

Number and percentage of listed buildings deemed to be ‘at risk’

A net reduction over the Plan Period

SO11

HE1

Historic England (HE)

LPI\HE4

Number and % of up-to date Conservation Area Appraisals

Increase over Plan Period

SO11

HE1

Bradford Council

LPI\MIN1

Levels of sand and gravel and crushed rock sales in West Yorkshire

To contribute towards local, sub-regional, regional and national requirement to maintain a steady supply of minerals.

SO19

MIN2

West Yorkshire Combined Authority (WYCA)

LPI\MIN2

Number of planning permissions for qualifying non-mineral development granted within an MSA.

No planning permissions granted for qualifying non-mineral development within an MSA

SO19

MIN3

Bradford Council

LPI\MIN3

Number of planning permissions granted for development including proposals for prior extraction of minerals

No Target. Monitor change / trend

SO19

MIN3

Bradford Council

LPI\MIN4

Number of planning permissions granted within 500m of existing mineral extraction sites.

No development unless justified

SO19

MIN3

Bradford Council

LPI\MIN5

Number of non-mineral proposals within safeguarded infrastructure sites.

No planning permissions granted for development that would constrain existing minerals infrastructure

SO19

MIN4

Bradford Council

LPI\MIN6

Number of planning permissions granted for new or extended mineral extraction sites

No planning permissions granted for mineral development that does not meet the criteria of Policy MIN7.

SO19

MIN7

Bradford Council

LPI\MIN7

Number of planning applications accompanied by a restoration scheme

All mineral development

SO19

MIN8

Bradford Council

LPI\MIN8

Number of planning applications granted contrary to advice on restoration from Natural England and/or Environment Agency

None (0)

SO19

MIN8

Bradford Council

LPI\MIN9

Number of planning permissions involving importation of waste meeting criteria in policy

No Target. Monitor change / trend

SO19

MIN8

Bradford Council

LPI\MIN10

Number of planning permissions consistent with policy criteria

All planning permissions consistent with policy criteria

SO19

MIN9

Bradford Council

LPI\MIN11

Number of planning applications granted contrary to advice from Natural England and/or Historic England and/or Environment Agency and/or Environmental Health Officer and/or Health & Safety Executive

None (0)

SO19

MIN9

Bradford Council

LPI\MIN12

Number of planning permissions consistent with policy criteria

All planning permissions consistent with policy criteria

SO19

MIN10

Bradford Council

LPI\MIN13

Number of planning applications granted contrary to advice from Natural England and/or Historic England and/or Environment Agency and/or Environmental Health Officer and/or Health & Safety Executive

None (0)

SO19

MIN10

Bradford Council

LPI\WAS1

Total waste arisings by type

No Target. Monitor change / trend

SO20

WAS1

Department for Environment, Food and Rural Affairs (DEFRA), Environment Agency (EA) and Bradford Council

LPI\WAS2

Number of planning applications for waste management facilities by type

No Target. Monitor change / trend

SO20

WAS1

Bradford Council

LPI\WAS3

Annual assessment of capacity of waste management facilities

No Target. Monitor change / trend

SO20

WAS1

Bradford Council

LPI\WAS4

Annual assessment of capacity of waste management facilities

No loss of existing waste management facilities and/or allocated sites

SO20

WAS3

Bradford Council

LPI\WAS5

Annual assessment of capacity of waste management facilities

Meet national waste reduction targets

SO20

WAS4

Bradford Council

LPI\WAS6

Planning applications for all types of development are accompanied by information setting out how waste will be managed

All planning permissions consistent with policy criteria

SO20

WAS5

Bradford Council

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top