Bradford District Local Plan - Publication Draft (Regulation 19) (October 2026)
Appendix 2 Policy Matrix Comment
|
RUDP |
Policy Title |
Core Strategy |
Policy Title |
BCCAAP |
Policy Title |
S&CRCAAP |
Policy Title |
Waste Management DPD |
Policy Title |
Regulation 18 LP Ref |
Policy Title |
Reg 18 SA Assessment |
Reg 19 LP Ref |
Policy Title |
Reg 19 Policy Changes |
|
Spatial Strategy and Strategic Policies |
|||||||||||||||
|
UDP2 |
Restraining Development |
SC1 |
Overall Approach and Key Spatial Priorities |
SCRC/H1 |
Housing Requirement |
SP2 |
Spatial Priorities |
SS1: Spatial Strategy |
Spatial Strategy |
Further narrative on the golden rules set out by the NPPF, mention of grey belt release, support for settlement expansion around public transport connections especially train stations, removal of mentions of Leeds Bradford Airport and Transport corridor |
|||||
|
UDP2 |
Restraining Development |
SC1 |
Overall Approach and Key Spatial Priorities |
SP3 |
Hierarchy of Settlements |
Inclusion of Hierarchy into policy SS1. |
|||||||||
|
SC4 |
Hierarchy of Settlements |
SL4 |
Cultural Assets |
SP4 |
Location of Development |
||||||||||
|
E6 |
Major Hotels and Conference |
EC5 |
EC5 City, Town, District and Local Centres |
SL2 |
Primary and Secondary Shopping Frontages |
EC4 |
City, Town, District and Local Centres |
(SS1) inclusion of the settlement hierarchy and the needs of each tier. (TC1) Hierarchy of retail centres mentioned |
|||||||
|
E10 |
Small Hotels and Guest |
||||||||||||||
|
E9 |
Use of Vacant or |
||||||||||||||
|
E10 |
Re-use or Development for |
||||||||||||||
|
CT2 |
Small Shops |
||||||||||||||
|
EC1 |
Creating a successful and competitive Bradford District economy within the Leeds City Region |
SP6 |
Economic Growth |
Policy diluted over SS1 & SS2 &EC1, |
|||||||||||
|
EC2 |
EC2 Supporting Business and Job Creation |
SL2 |
Primary and Secondary Shopping Frontages |
||||||||||||
|
E1 |
Protecting Allocated |
EC4 |
EC4 Sustainable Economic Growth |
||||||||||||
|
E3 |
Protecting Existing |
||||||||||||||
|
E4 |
Protecting Existing |
||||||||||||||
|
E5A |
Adaptation of agricultural |
||||||||||||||
|
E5 |
Farm Diversification and New |
||||||||||||||
|
E6 |
Employment Zones |
||||||||||||||
|
E8 |
New Tourist Facilities |
SS2: Regional City of Bradford |
|||||||||||||
|
H01, HO2, HO3. HO4, HO6, HO7 |
HO1 Scale of Housing Required |
SP8 |
Housing Growth |
Growth Requirements |
New Policy now includes Employment. |
||||||||||
|
HO2 |
Strategic Sources of Housing Supply |
||||||||||||||
|
HO3 |
Distribution of Housing Development |
||||||||||||||
|
HO4 |
Phasing the Release of Housing Sites |
||||||||||||||
|
HO6 |
Maximising the Use of Previously Developed Land |
||||||||||||||
|
HO7 |
Housing Site Allocation Principles |
||||||||||||||
|
SS3: Towns and Villages |
|||||||||||||||
|
SS2: Growth Requirements |
|||||||||||||||
|
UDP1 |
Promoting Sustainable Patterns of Development |
P1 |
Presumption in Favour of Sustainable Development |
SP1 |
Delivering Sustainable Development |
ST1: Delivering Sustainable Development |
Delivering Sustainable Development |
Further narrative on anchoring climate change more directly within the policy. |
|||||||
|
TM1 |
Transport Assessment |
TR1 |
TR1 Travel Reduction and Modal Shift |
SP7 |
Planning for Sustainable Transport |
ST2: Sustainable Movement & Connectivity |
Sustainable Movement and Connectivity |
Combining of efficiency and technological key principals (3 & 4) into future mobility principal. Mention of direct transport schemes included in ST2 |
|||||||
|
TM2 |
Impact of Traffic and its |
||||||||||||||
|
TM10A |
Other Road Users |
||||||||||||||
|
TM19 |
Cycle Parking |
||||||||||||||
|
TM4 |
Rail Stations |
TR3 |
TR3 Public Transport, Cycling and Walking |
||||||||||||
|
SC2 |
Climate Change and Resource Use |
SP9 |
Climate Change, Environmental Sustainability and Resource Uses |
ST3: Climate Resilience, Environmental Sustainability & Resource Use |
Climate Change, Sustainability and Resource Use |
Introduction of carbon assessments where appropriate |
|||||||||
|
UR3 |
The Local Impact of |
SC9 |
Making Great Places |
SCRC/H2 |
Delivering New Homes and Sustainable Neighbourhoods |
SP14 |
Making Great Places |
ST4: Creating Well Designed and Healthy Places |
Creating Well Designed and Healthy Places |
||||||
|
D4 |
Community Safety |
SCRC/CC2 |
Sustainable Design and Construction |
||||||||||||
|
SCRC/NBE6 |
Ensuring high-quality design |
CO3 |
Health Impact Assessments |
HIA is addressed in Policy ST4 including threshold and applicable developments. |
|||||||||||
|
SP5 |
Green Belt |
ST5: Green Belt |
Green Belt |
Grey Belt and Golden rules updated NPPF notes. Removal of direct green belt release sites |
|||||||||||
|
SC6 |
Green Infrastructure |
M6 |
Green / Blue Infrastructure and Open |
SP10 |
Green Infrastructure |
ST6: Strategic Green and Blue Infrastructure Network |
Strategic Green and Blue Infrastructure Network |
||||||||
|
BF1 |
The Nature of the Built Form |
||||||||||||||
|
ST7: Delivering Infrastructure |
|||||||||||||||
|
ST8: Developer Contributions |
|||||||||||||||
|
Planning for Homes |
|||||||||||||||
|
HO4 in part |
Phasing and Release of Housing Sites |
CL1 |
Housing |
SCRC/H2 |
Delivering new homes and sustainable neighbourhoods |
HO1 |
Housing Delivery and Strategic Sites |
HO1: Housing Delivery |
Housing Delivery |
Streamlined and simplified for clarity |
|||||
|
HO5 |
Density of Housing Schemes |
HO2 |
Housing Density |
HO2: Housing Density |
Housing Density |
Greater specification of where an increase of housing density is necessary. |
|||||||||
|
HO3 - New |
Urban Housing |
||||||||||||||
|
HO8 |
Housing Mix |
HO4 |
Housing Mix |
HO3: Housing Mix |
Housing Mix, HMO'S |
further detail and depth on the needs of the district. Inclusion of subheadings such as bungalows, BGM, and co living |
|||||||||
|
H9 |
Affordable Housing |
HO11 |
Affordable Housing |
HO5 |
Affordable Housing |
HO4: Affordable Housing |
Affordable Housing |
strengthening of green belt target and inclusion of grey belt target. Exclusion of tenure mix for affordable housing requirements. Overall streamlined |
|||||||
|
H10 |
Affordable Housing - Rural |
||||||||||||||
|
H9 |
Affordable Housing |
HO8 (part) |
Housing Mix |
HO6 |
Custom and Self Build Housing |
HO5: Self-Build & Custom Build Housing |
Self-Build & Custom Build Housing |
removal of development of over 100 dwellings, developers will be required to supply at least 5% of the dwelling plots for sale to self-builders. New inclusion of Self Build and Custom Build Housing developments are exempt from the CIL. |
|||||||
|
H10 |
Affordable Housing - Rural |
HO7 |
Specialist Housing and Accommodation |
HO6: Supported and Specialist Accommodation |
Supported and Specialist Accommodation |
||||||||||
|
HO12 |
Provision of Sites for Gypsies, Travellers and Travelling Showpeople |
HO8 |
Sites for Gypsies, Travellers and Travelling Showpeople |
HO7: Gypsy and Traveller and Travelling Showpersons Accommodation |
Gypsy and Traveller and Travelling |
Inclusion of authorised sites and delivery information. Inclusion of; Should an authorised site or yard be temporarily or permanently closed due to environmental factors, regeneration or major project activity a collaborative process with residents should be undertaken to identify the provision of suitable alternative accommodation prior to displacement. |
|||||||||
|
D2 |
Energy Efficiency and |
HO9 |
Housing Quality |
HO9 |
Housing Standards |
HO8: Housing Design Standards |
Housing Design Standards |
Much more depth and explanation of expectation. |
|||||||
|
HO10 |
Overcrowding and Vacant Homes |
HO10 |
Overcrowding and Empty Homes |
HO9: Overcrowded & Empty Homes* |
Overcrowding and Empty Homes |
Word for word the same |
|||||||||
|
HO8 |
Housing Mix |
CL1 |
Housing |
HO4 |
Housing Mix |
HO10: Housing of Multiple Occupation |
Housing Mix, HMO'S |
Further detail and depth on the needs of the district. Inclusion of subheadings such as bungalows, BGM, and co living |
|||||||
|
Planning for Prosperity (Economy, Retail/Town Centres, Transport & Connectivity) |
|||||||||||||||
|
Economy |
|||||||||||||||
|
EC1 |
Creating a successful and competitive Bradford District economy within the Leeds City Region |
SCRC/SE1 |
Sustainable Economic Growth |
SP6 |
Economic Growth |
EC1: Employment Sites |
|||||||||
|
EC2 |
EC2 Supporting Business and Job Creation |
||||||||||||||
|
E1 |
Protecting Allocated |
EC4 |
EC4 Sustainable Economic Growth |
||||||||||||
|
E3 |
Protecting Existing |
||||||||||||||
|
E4 |
Protecting Existing |
||||||||||||||
|
E5A |
Adaptation of agricultural |
||||||||||||||
|
E5 |
Farm Diversification and New |
||||||||||||||
|
E6 |
Employment Zones |
||||||||||||||
|
E8 |
New Tourist Facilities |
||||||||||||||
|
EC2, EC3 |
EC2 Supporting Business and Job Creation |
EC1 |
Employment Land Delivery and Strategic Sites |
Employment Sites |
References to SS2 for employment need |
||||||||||
|
Employment Zones |
B1 |
Development of Employment Space |
SCRC/SE2 |
Canal Road Employment Zone |
EC2 |
Enterprise, Business and Employment Zones |
EC2: Employment Zones |
Employment Zone |
Removal of the types of zones, combined into only employment zones |
||||||
|
EC3 |
Employment and Skills Delivery |
EC3: Employment Skills and Delivery |
Employment and Skills Delivery |
New Policy less defined on what the council seeks to secure from a given project and requires the council to evaluate on a case-to-case basis |
|||||||||||
|
TM8 |
Transport Assessment |
TR4 |
Transport and Tourism |
TR4 |
Transport and Tourism |
EC4: Sustainable Tourism and the Visitor Economy |
|||||||||
|
Retail & Town Centre |
|||||||||||||||
|
E6 |
Major Hotels and Conference |
EC5 |
EC5 City, Town, District and Local Centres |
SCRC/SE4 |
Strategy for Retail Development |
EC4 |
City, Town, District and Local Centres |
TC1: Hierarchy of Centres |
Hierarchy of Centres |
(SS1) inclusion of the settlement hierarchy and the needs of each tier. (TC1) Hierarchy of retail centres mentioned |
|||||
|
E10 |
Small Hotels and Guest |
||||||||||||||
|
E9 |
Use of Vacant or |
||||||||||||||
|
E10 |
Re-use or Development for |
SL2 |
Primary and Secondary Shopping Frontages |
SCRC/SE5 |
Shipley Town Centre and Primary Shopping Area |
||||||||||
|
CT2 |
Small Shops |
||||||||||||||
|
SL1 |
Retail Development |
SCRC/SE3 |
Valley Road Retail Area |
TC2: Development within Designated Centres |
|||||||||||
|
SCRC/SE6 |
Market Provision |
TC3: Out of Centre Development |
|||||||||||||
|
TC4: Hot Food Takeaways |
|||||||||||||||
|
Transport & Connectivity |
|||||||||||||||
|
SCRC/ST2 |
Safeguarded Transport Links |
TR1: Safeguarding |
|||||||||||||
|
TM4 |
Railway Lines and Former |
TR3 |
TR3 Public Transport, Cycling and Walking TR5 Improving Connectivity and Accessibility |
SCRC/ST3 |
Maximising Sustainable Transport Options |
TR2 |
Transport and Environment |
TR2: Integrating Sustainable Transport and Development |
Integrating Sustainable Transport & Development |
Strengthening the use of SMART through the NPPF and PPG. |
|||||
|
TM20 |
Bus Priority |
M2 |
Public Transport Services and Infrastructure (including Taxis) |
SCRC/ST1 |
Transport Improvements |
||||||||||
|
TM5 |
Park and Ride |
M5 |
Biodiversity in the City Centre |
SCRC/ST4 |
Station Improvements |
||||||||||
|
TM6 |
New Pedestrian and Cycle |
M1 |
Walking, Cycling and Public Realm |
SCRC/ST8 |
Bradford Canal |
||||||||||
|
TM7 |
The National and Local |
||||||||||||||
|
TM8 |
Rail Stations |
TR5 |
Improving Connectivity and Accessibility |
SL3 |
Improving the Connections Between Shopping Areas |
||||||||||
|
TM10 |
Bus Priority |
||||||||||||||
|
TM4 |
Rail Stations |
TR3 |
Public Transport, Cycling and Walking |
M1 |
Walking, Cycling and Public Realm |
TR3 |
Transport and Development |
||||||||
|
TM6 |
Railway Lines and Former |
||||||||||||||
|
TM4 |
Bus Priority |
||||||||||||||
|
TM5 |
Park and Ride |
||||||||||||||
|
TM6 |
New Pedestrian and Cycle |
M4 |
Impact of new development upon the |
||||||||||||
|
TM7 |
The National and Local |
||||||||||||||
|
TM10 |
Bus Priority |
TR2 |
Parking Policy |
SCRC/ST7 |
Parking |
TR5 |
Parking |
TR3: Parking |
Parking |
Strengthening of cycle parking, much greater depths and examples of where types of parking are encouraged. |
|||||
|
TM1 |
Park and Ride |
M3 |
Traffic, Highways and Parking |
||||||||||||
|
TM6 |
Parking Standards for |
||||||||||||||
|
TM7 |
Parking Standards for |
||||||||||||||
|
TM11 |
Parking for People with |
||||||||||||||
|
TM18 |
Parking for People with |
||||||||||||||
|
TM12 |
Cycle Parking |
||||||||||||||
|
CT3 |
Rail Stations |
TR7 |
Transport Investment and Management Priorities |
SCRC/ST5 |
Pedestrian and Cycle Movements |
TR1 |
Strategic Transport Delivery |
TR4: Walking and Cycling |
Walking and Cycling |
Policy areas split into several new individual policies better supporting clarity. |
|||||
|
CR3A |
Transport and Highway |
M1 |
Walking, Cycling and Public Realm |
SCRC/ST6 |
Canal Road Greenway |
||||||||||
|
TM21 |
Rail and Water Freight Facilities |
TR6 |
Freight |
TR6 |
Freight |
TR5: Freight & Logistics |
Freight & Logistics |
introduction of All major developments immediately adjacent to the rail network and a railway |
|||||||
|
TM19 |
Aircraft Safety * |
TR8 |
Aircraft Safety |
TR7 |
Aircraft Safety |
TR6: Aircraft Safety |
Aircraft Safety |
Reworded for clarity |
|||||||
|
Planning for Places & Communities (Place Making/Design; Communities; Natural & Built Environment; Climate Change/Resource Use; Minerals; Waste) |
|||||||||||||||
|
Design and Place-making |
|||||||||||||||
|
UR3 |
The Local Impact of |
DS1 |
Achieving Good Design |
DS1 |
Achieving Good Design |
DS1: Design Processes |
Design Process |
Taking account of the Neighbourhood Plans, and larger contexts. Further clarification on community engagement and design tools. |
|||||||
|
D2 |
Energy Efficiency and |
||||||||||||||
|
D5 |
Landscaping |
||||||||||||||
|
D1 |
General Design |
||||||||||||||
|
UR3 |
The Local Impact of |
DS2 |
Working with the Landscape |
BF3 |
Built Form and the Environment |
DS2 |
Working with the Landscape |
DS2: Landscape Design |
Landscape Design |
Further anchoring into the green and blue infrastructure network where possible. Maximising use of land avoiding left over spaces of uncertain |
|||||
|
D5 |
Landscaping |
||||||||||||||
|
D1 |
General Design |
||||||||||||||
|
UR3 |
The Local Impact of |
DS3 |
Urban character |
DS3 |
Urban Character |
DS3: Urban Character and Form |
Urban Character and Form |
New inclusion of Character assessments, Landform, urban form, Appearance, Tall buildings, and Shopfronts. Further guidance and detail on all above. Expanded for clarity. |
|||||||
|
D11 |
Gateways |
||||||||||||||
|
D12 |
Tall Buildings |
BF2 |
Tall Buildings |
||||||||||||
|
D13 |
Shop Fronts |
CL3 |
Active Frontages and Community Provision |
||||||||||||
|
SL2 |
Primary and Secondary Shopping Frontages |
||||||||||||||
|
D5 |
Landscaping |
||||||||||||||
|
D8 |
Public Art |
||||||||||||||
|
D1 |
General Design |
||||||||||||||
|
UR3 |
The Local Impact of |
DS4 |
Streets and Movement |
DS4 |
Streets and Movement |
DS4: Street Design |
Street Design |
Introduction of movement strategy, and inclusive streets. Clearer direction, and clarification on integration and creation of new streets. |
|||||||
|
D10 |
Environmental |
||||||||||||||
|
D7 |
Meeting the Needs of |
||||||||||||||
|
D7A |
Meeting the Needs of |
||||||||||||||
|
D6 |
Meeting the Needs of |
||||||||||||||
|
D1 |
General Design |
||||||||||||||
|
TM19A |
Traffic Management and |
||||||||||||||
|
UR3 |
The Local Impact of |
DS5 |
Safe and Inclusive Places |
DS5 |
Safe and Inclusive Places |
DS5: Safe & Inclusive Places |
Safe & Inclusive Places |
More focused assessment of creating new safe and welcoming spaces. |
|||||||
|
D14 |
External Lighting |
||||||||||||||
|
D1 |
General Design |
||||||||||||||
|
D4 |
Access for People with |
||||||||||||||
|
D3 |
Community Safety |
||||||||||||||
|
TM19A |
Traffic Management and |
||||||||||||||
|
DS6: Housing Design |
|||||||||||||||
|
Supporting Sustainable Communities |
|||||||||||||||
|
SCRC/HSC3 |
Community Infrastructure |
CO2 |
Community and Health Facilities |
SC1: Community Facilities and Infrastructure |
Community Facilities and Infrastructure |
Further detail on co-location of services being supported. |
|||||||||
|
SC2: Cemetery & Burial Provision |
Cemetery & Burial Provision |
||||||||||||||
|
CL4 |
Primary and Secondary Education Provision |
CO2 |
Community and Health Facilities |
SC3: Education Infrastructure |
Education Infrastructure |
Further detail on Education matters. |
|||||||||
|
ED1 |
Promotion of the Learning Quarter |
||||||||||||||
|
SC4: Provision of Health Infrastructure |
Provision of Health Infrastructure |
||||||||||||||
|
SP15 |
Creating Healthy Places |
Further inclusion of green infrastructure and transport being a part of Health Infrastructure. |
|||||||||||||
|
SC5: Sports & Recreation Provision |
|||||||||||||||
|
SC6: Digital & Telecommunications Connectivity |
|||||||||||||||
|
SC8: Health Impact Assessments |
|||||||||||||||
|
Climate & Resources |
|||||||||||||||
|
P1 |
Air Quality |
EN8 |
Air Quality |
CR1: Air Quality |
Air Quality |
Clean Air Zone (CAZ) – Enhanced Requirements, Proposals for Biomass Boilers, Major Development (District-wide) requirements |
|||||||||
|
P2 |
Air Pollution |
||||||||||||||
|
NR15A |
Management of Pollution, |
EN8 |
Environmental Protection Policy |
SCRC/HSC1 |
Hazardous Installations |
EN9 |
Environmental Protection |
CR2: Environmental Protection |
Environmental Protection |
Inclusion of Riparian buffers, clearer objectives to achieve, further depth. |
|||||
|
P7 |
Noise |
||||||||||||||
|
P6 |
Unstable Land |
||||||||||||||
|
P16 |
Reworking or Disturbance |
||||||||||||||
|
P5 |
Development Close to |
||||||||||||||
|
P3 |
Hazardous Installations |
||||||||||||||
|
P2 |
Air Pollution |
||||||||||||||
|
P1 |
Air Quality |
||||||||||||||
|
NR17A |
Water Courses and |
||||||||||||||
|
NR17 |
Restraining Development |
||||||||||||||
|
UDP8 |
Use of Natural Resources |
EN6 |
Energy |
EN10 |
Energy |
CR3: Renewable and Low Carbon Energy |
Renewable and Low Carbon Energy |
Removal of differation domestic and non-domestic standards. Larger emphasis on energy projects. |
|||||||
|
NR12 |
Renewable Energy |
BF4 |
District Heat Networks |
||||||||||||
|
NR13 |
Wind Farms and Turbines |
||||||||||||||
|
UDP2 |
Restraining Development |
EN7 |
Flood Risk |
CL2 |
Flood Risk |
SCRC/CC1 |
Flood Risk and Water Management |
EN7 |
Flood Risk |
CR4: Flood Risk and Water Management |
Flood Risk and Water Management |
Now included water management. Further anchoring in climate change and evidence-based work such as the site-specific flood risk assessment |
|||
|
NR16 |
Surface Water Run Off |
||||||||||||||
|
NR15B |
Flood Risk |
||||||||||||||
|
NR15A |
Washland |
||||||||||||||
|
Natural Environment |
|||||||||||||||
|
NE13 |
Wildlife Corridor Network |
SC6 |
Green Infrastructure |
M6 |
Green / Blue Infrastructure and Open |
SCRC/NBE1 |
Green Infrastructure |
EN1 - New |
Green Infrastructure Standards |
NE1: Green Infrastructure Standards |
Green Infrastructure Standards |
Development proposals should use a design-led approach to integrate Green |
|||
|
CF7B |
Built Facilities for |
EN1 |
Protection and improvements in provision of |
SCRC/NBE2 |
Waterway Environments |
CO1 |
Open Spaces, Sport and Recreation |
NE2: Open Space, Play and Sport and Recreation |
Open Spaces, Sport and Recreation |
further Local Green |
|||||
|
OS1 |
Urban Greenspace |
SCRC: NBE3 |
The Bradford Beck |
||||||||||||
|
OS2 |
Protection of Recreation |
SCRC/HSC2 |
Open Space, Sport and Recreation |
||||||||||||
|
OS3 |
Protection of Playing Fields |
||||||||||||||
|
OS4 |
New Open Space Provision |
||||||||||||||
|
OS5 |
Provision of recreation |
||||||||||||||
|
OS6 |
Allotments |
||||||||||||||
|
OS7 |
Village Greenspace |
||||||||||||||
|
OS8 |
Small Areas of Open Land |
||||||||||||||
|
NE2 |
Outdoor Sport and |
||||||||||||||
|
SC8 |
Protecting the South Pennine Moors and their Zone of Influence |
SP11 |
South Pennine Moors |
NE3: Protecting the South Pennine Moors SPA/SAC |
Further detailed guidance for |
||||||||||
|
NE7 |
Sites of International |
EN2 |
Biodiversity and Geodiversity |
SCRC/NBE4 |
Biodiversity and Ecology |
EN2 |
Biodiversity and Geo-diversity |
NE4: Biodiversity & Geodiversity |
Biodiversity & Geodiversity |
Removal of biodiversity and development to be included in own policy NE5. |
|||||
|
NE8 |
Sites of Special Scientific |
||||||||||||||
|
NE9 |
Other Sites of Landscape |
||||||||||||||
|
NE10 |
Protection of Natural |
||||||||||||||
|
NE11 |
Ecological Appraisals |
||||||||||||||
|
NE12 |
Landscape and wildlife |
||||||||||||||
|
NE13 |
Wildlife Corridor Network |
||||||||||||||
|
NE5: Biodiversity & Development (inc. Net Gain) |
|||||||||||||||
|
NE4 |
Trees and Woodlands |
EN5 |
Trees and woodlands |
EN3 |
Trees and Woodlands |
NE6: Trees, Woodland & Hedgerows |
Trees, Woodland, & Hedgerows |
Inclusion of Hedgerows, irreplaceable habitats, New Tree and Hedgerow Provision, Urban Tree Canopy Cover. With direct standards of UTCC. |
|||||||
|
NE5 |
Retention of Trees on |
||||||||||||||
|
NE6 |
Protection of Trees During |
||||||||||||||
|
NE3 |
Landscape Character |
EN4 |
Landscape |
EN5 |
Landscape |
NE7: Landscape Character and Sensitivity |
Landscape Character and Sensitivity |
Refers to the LSA, and Landscape Character Assessment. Larger depth and explanation of expectations |
|||||||
|
NE3A |
Landscape Character |
||||||||||||||
|
UDP2 |
Restraining Development |
EN6 |
Countryside and Development |
NE8: Development in the Countryside |
Development In the Countryside |
Inclusion of Tourist Facilities and Accommodation, and Public Rights of Way Network. |
|||||||||
|
UR5 |
Safeguarded Land |
SC7 |
Green Belt |
SP5 |
Green Belt |
NE9: Development in the Green Belt |
Development in the Green Belt |
Grey Belt and Golden rules updated NPPF notes. Removal of direct green belt release sites |
|||||||
|
GB2 |
Siting of New Building in |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
GB1 |
New Building in the Green |
Saved until adoption of the Allocations DPD. |
|||||||||||||
|
Historic Environment |
|||||||||||||||
|
BH1 |
Change of Use of Listed |
EN3 |
Historic Environment |
SCRC/NBE5 |
Heritage and Conservation |
EN4 |
Historic Environment |
HE1: Historic Environment |
Historic Environment |
Direct mention of Saltaire World Heritage site, and heritage assets of the district. Streamlined for clarity. |
|||||
|
BH2 |
Demolition of Listed |
||||||||||||||
|
BH3 |
Archaeological Recording |
||||||||||||||
|
BH4 |
Alteration, Extension or |
||||||||||||||
|
BH4A |
Setting of Listed Buildings |
||||||||||||||
|
BH5 |
Shop Fronts on Listed |
||||||||||||||
|
BH6 |
Display of Advertisements |
||||||||||||||
|
BH7 |
New Development in |
||||||||||||||
|
BH8 |
Shop Fronts in |
||||||||||||||
|
BH9 |
Demolition Within a |
||||||||||||||
|
BH10 |
Open Space Within or |
||||||||||||||
|
BH11 |
Space About Buildings in |
||||||||||||||
|
BH12 |
Conservation Area |
||||||||||||||
|
BH13 |
Advertisements in |
||||||||||||||
|
S/BH14 |
Saltaire World Heritage |
||||||||||||||
|
BS/BH15 |
Adwalton Moor |
||||||||||||||
|
BH16 |
Historic Parks and |
||||||||||||||
|
BH17 |
Local Historic Parks and |
||||||||||||||
|
BH18 |
Development Affecting |
||||||||||||||
|
BH19 |
Development Affecting |
||||||||||||||
|
BH20 |
The Leeds and Liverpool |
||||||||||||||
|
Minerals |
|||||||||||||||
|
SP12 - New |
Strategic Planning for Minerals |
MIN1: Planning for Minerals |
|||||||||||||
|
UDP8 |
Use of Natural Resources |
EN10 |
EN10 Sandstone Supply |
EN11 |
Minerals Supply and Landbanks |
MIN2: Minerals Supply and Landbanks |
Minerals Supply and Landbanks |
Streamlined for clarity |
|||||||
|
NR5 |
Aggregate Area of Search |
||||||||||||||
|
NR7 |
Aggregate Produced from |
||||||||||||||
|
NR4 |
Operational Criteria for |
||||||||||||||
|
NR3 |
Mineral Extraction - |
||||||||||||||
|
NR3 |
Mineral Extraction - |
EN11 |
Sand, Gravel, Fireclay, Coal and Hydrocarbons (oil |
||||||||||||
|
NR9 |
Oil and Natural Gas |
||||||||||||||
|
NR5 |
Aggregate Area of Search |
||||||||||||||
|
NR11A |
Coal Extraction |
||||||||||||||
|
NR11B |
Coal Extraction |
||||||||||||||
|
NR4 |
Operational Criteria for |
||||||||||||||
|
NR1 |
Safeguarding (Mineral) |
EN12 |
Minerals Safeguarding |
SCRC/SE7 |
Minerals Safeguarding |
EN13 |
Minerals Safeguarding |
MIN3: Mineral Safeguarding |
Mineral Safeguarding |
assessment should be undertaken and consider: |
|||||
|
MIN4: Mineral Infrastructure Safeguarding (Strategic Policy) |
|||||||||||||||
|
Bradford North Constituency Proposals – Policy NR1: Mineral |
Mineral Extraction - |
EN12 |
Mineral Allocations |
MIN5: Minerals Allocations |
Mineral Allocations |
New allocations added. |
|||||||||
|
NR3 |
Mineral Extraction - |
EN10 |
EN10 Sandstone Supply |
EN14 |
Minerals Area of Search |
MIN6: Minerals Areas of Search |
Minerals Area of Search |
firming of areas given on policy map over external map criteria. |
|||||||
|
NR5 |
Mineral Extraction - |
EN11 |
Sand, Gravel, Fireclay, Coal and Hydrocarbons (oil |
||||||||||||
|
NR9 |
Oil and Natural Gas |
||||||||||||||
|
NR5 |
Aggregate Area of Search |
||||||||||||||
|
NR11A |
Coal Extraction |
||||||||||||||
|
NR11B |
Coal Extraction |
||||||||||||||
|
NR4 |
Operational Criteria for |
||||||||||||||
|
NR2 |
Mineral Extraction - |
EN9 |
EN9 New Minerals Extraction Sites |
EN15 |
Managing Development of Minerals Sites |
MIN7: Proposals for New or Extended Mineral Sites |
PROPOSALS FOR NEW OR EXTENDED MINERAL SITES |
Further depth, detail, and support for the opening of new mineral sites or extensions. Further anchoring to climate change mitigation requirements. |
|||||||
|
NR4 |
Operational Criteria for |
||||||||||||||
|
NR9 |
Oil and Natural Gas |
||||||||||||||
|
NR11A |
Coal Extraction |
||||||||||||||
|
NR11B |
Coal Extraction |
||||||||||||||
|
NR3 |
Mineral Extraction - |
||||||||||||||
|
NR1 |
Safeguarding (Mineral) |
EN12 |
EN12 Minerals Safeguarding |
||||||||||||
|
EN16 |
Mineral Site Restoration and Aftercare |
MIN8: Mineral Site Restoration, Aftercare and After-use |
MINERAL SITE RESTORATION, AFTERCARE AND AFTER-USE |
More anchoring to climate change factors, biodiversity gains, and streamlined for clarity |
|||||||||||
|
NR3 |
Mineral Extraction - |
EN11 |
Sand, Gravel, Fireclay and Coal Supply |
EN17 |
Energy Minerals |
MIN9: Oil and Gas (Hydrocarbon) Exploration and Production |
OIL & GAS (HYDROCARBON) EXPLORATION AND |
Policy split into two. Main principals remain the same |
|||||||
|
NR9 |
Oil and Natural Gas |
||||||||||||||
|
NR5 |
Aggregate Area of Search |
||||||||||||||
|
NR11A |
Coal Extraction |
MIN10: Coal Extraction |
|||||||||||||
|
NR11B |
Coal Extraction |
||||||||||||||
|
P15 |
Operational Criteria for |
||||||||||||||
|
Waste |
|||||||||||||||
|
P8 |
Waste Management |
WM1 |
WM1 Waste Management |
SCRC/SE8 |
Existing Waste Management Facilities |
W4 |
Sites for Construction, Demolition & Excavation |
SP13 |
Waste Management and Infrastructure |
WAS1: Planning for Sustainable Waste Management (Strategic Policy) |
PLANNING FOR SUSTAINABLE WASTE MANAGEMENT |
||||
|
P9 |
Household Recycling |
W5 |
Sites for Agricultural Waste |
||||||||||||
|
P10 |
Green Waste Composting |
WM2 |
WM2 Waste Management |
W6 |
Sites for Hazardous Waste |
||||||||||
|
P11 |
Waste Incineration P12 |
W7 |
Site for Final Residual Waste for Disposal |
||||||||||||
|
WDM1 |
Unallocated Sites |
||||||||||||||
|
WDM5 |
Landfill Development for Disposal of Final |
||||||||||||||
|
Policy W3: Proposed Waste Site Allocations. |
Proposed Waste Site Allocations |
EN19 |
Waste Management Allocations |
WAS2: Waste Management Allocations |
Waste Management Allocations |
Allocations updated |
|||||||||
|
Policy WDM3: Applications Resulting in the Loss of a |
Applications Resulting in the Loss of a Proposed or Existing Waste |
EN20 |
Safeguarding Waste Management Facilities |
WAS3: Safeguarding Waste Management Facilities & Infrastructure |
SAFEGUARDING WASTE MANAGEMENT FACILITIES & |
||||||||||
|
P12 |
Mineral Extraction - |
Policy WDM2: Assessing All Applications for New and |
Assessing All Applications for New and Expanded Waste Management Facilities |
EN18 |
Waste Management Development |
WAS4 : Proposals for Waste Management Development |
PROPOSALS FOR WASTE MANAGEMENT DEVELOPMENT |
||||||||
|
P15 |
Landfill Operational Matters |
||||||||||||||
|
NR4 |
Waste Management - |
||||||||||||||
|
Policy WDM4: Waste Management within Development |
Waste Management within Development |
EN21 |
Waste Management within Development |
WAS5: Waste Management Within Development |
Waste Management within Development |
now mentions new developments in proximity of waste management facilities. Proposals for all development must ensure that provision is made for |
|||||||||
|
Implementation & Delivery |
|||||||||||||||
|
ID1: Development Contributions |
|||||||||||||||
|
ID2: Infrastructure Delivery |
|||||||||||||||
|
Policies Not Continued |
|||||||||||||||
|
SC3 |
Working together to make Great Places |
SP16 |
Working Together |
||||||||||||
|
UDP3 |
Quality of Built and |
Superseded by Core Strategy DPD policy Objectives & Strategic Core Policies |
|||||||||||||
|
UDP4 |
Economic Regeneration |
Superseded by Core Strategy DPD policy Objectives & Strategic Core Policies |
|||||||||||||
|
UDP5 |
Continuing Vitality of |
Superseded by Core Strategy DPD policy Objectives & Strategic Core Policies |
|||||||||||||
|
UDP6 |
Reducing the Need to |
||||||||||||||
|
UDP7 |
Promoting Sustainable |
Superseded by Core Strategy DPD |
|||||||||||||
|
UR2 |
Planning Obligations and |
ID3 |
Developer Contributions |
||||||||||||
|
CF2 |
Education Contributions in |
||||||||||||||
|
UR6 |
Mixed Use Areas |
||||||||||||||
|
UR7A |
Action Areas |
||||||||||||||
|
UR11 |
Storage and Distribution |
Superseded by NPPF and in practice is not saved |
|||||||||||||
|
E7 |
Phase 1 Housing Sites |
||||||||||||||
|
H1 |
Phase 2 Housing Sites |
||||||||||||||
|
H2 |
Monitoring The Housing Supply |
||||||||||||||
|
H3 |
Protecting Allocated Housing Sites |
Superseded. |
|||||||||||||
|
H4 |
Residential Development of Land and Buildings not Protected for Other Purposes |
||||||||||||||
|
H5 |
Non-Residential |
Superseded by NPPF and Core Strategy DPD thematic Housing policies |
|||||||||||||
|
H6 |
Housing Density - |
HO5 |
Density of Housing Schemes |
||||||||||||
|
H7 |
Housing Density - Efficient |
||||||||||||||
|
CT1 |
Development within City |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CT4 |
Safeguarding of Arcades |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CT5 |
Primary Shopping Areas |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CT6 |
Amenity within City and |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CR1A |
Retail Development |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CR2A |
Areas of Deficiency |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CR4A |
Other Retail Development |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CR5A |
Specialist Retailing |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CL1 |
Leisure and Entertainment |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CL2 |
Leisure and Entertainment |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
CL3 |
Leisure and Entertainment |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
TM9 |
Protection of Routes |
||||||||||||||
|
TM13 |
On-Street Parking Controls |
||||||||||||||
|
TM14 |
Public Parking in City and |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
TM15 |
Parking Provision Within |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
TM16 |
Private Off Street Parking |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
TM17 |
Protection of Car and |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
TM21 |
Rail and Water Freight Facilities |
||||||||||||||
|
TM22 |
Lorry Parking |
||||||||||||||
|
D15 |
Advertisements |
Superseded by NPPF and Core Strategy DPD. |
|||||||||||||
|
D16 |
Telecommunications |
Superseded by NPPF and Core Strategy DPD. |
|||||||||||||
|
CF1 |
New School Sites |
Superseded by Core Strategy DPD |
|||||||||||||
|
CF3 |
Community Uses |
Superseded by Core Strategy DPD |
|||||||||||||
|
CF4 |
Hospital Development |
Superseded by Core Strategy DPD |
|||||||||||||
|
CF5 |
Protection of Rural Shops |
Superseded by Core Strategy DPD |
|||||||||||||
|
CF6 |
Development of |
Superseded by Core Strategy DPD |
|||||||||||||
|
CF7A |
Change of Use of Buildings |
Superseded by Core Strategy DPD |
|||||||||||||
|
GB3 |
Infill development in the |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
GB4 |
Conversion and Change of |
Saved until adoption of the Allocations DPD and Area Action Plan DPDs. |
|||||||||||||
|
GB5 |
Extension and Alteration of |
Superseded by NPPF. |
|||||||||||||
|
GB6 |
Replacement Dwellings in |
Superseded by NPPF. |
|||||||||||||
|
GB6A |
Major Developed Sites |
Superseded by NPPF. |
|||||||||||||
|
NR6 |
Aggregate Landbanks |
||||||||||||||
|
NR8 |
Major Developed Sites |
||||||||||||||
|
NR10 |
Peat Extraction |
Superseded by NPPF. |
|||||||||||||
|
NR14 |
Agricultural Land |
Superseded by NPPF and Core Strategy DPD. |
|||||||||||||
|
P4 |
Contaminated Land |
||||||||||||||
|
P13 |
Inert Waste – Landfill |
W4 |
Sites for Construction, Demolition and Excavation Waste |
||||||||||||
|
P14 |
Biodegradable Waste - Landfill |
WDM5 |
Landfill Development for Final Disposal of Residual Waste |
